Back to Creators
IMImNotHarsh | 📈💸

ImNotHarsh | 📈💸

@imnotharsh
AIEnglishEmerging (1K–30K)Following 464Tracked since 2026-11-22

Derivatives Trader | Banking & Capital Markets | ex-Consulting Semiconductor Enthusiast | Early $INTC 🐂 Founder & Principal @INHCapital | Not Financial Advice

Followers
7.6K
+175 / 7d · +2.4%
Typical Views
—
30d · 1 posts
Bookmark %
—
Like 0.3%Eng. 0.6%
30d Breakout Hits
0
since 2026-11-22
Reach RatioTypical Views / FollowersBuilding baseline
Peer Median 17% (Emerging (1K–30K))Methodology →

1 / 5 valid mature posts recorded across 30d–90d windows; peer reach comparison unlocks at 5 posts.

1 / 5 valid public posts recorded; typical reach computes at 5 posts.

8-Day Follower Growth

Hover to inspect daily follower changes

8d Change
+196(+2.7%)
7.60K7.50K7.40K7.30K11-1711-2411-25

Content Format Mix

Original 100%Thread 0%Quote 0%Reply 0%

14-Week Posting Cadence

2026-11-16 Mon1 post

Tracked since 2026-11-22 (1 active days recorded).

14w Posts
1
Active Days
1/10
Active Weeks
1/2
Avg / Week
0.7
Peak Day
1
Peak Day/Wk
Mon
AugSepOctNovMonWedFriSun
08-20 → 11-25
LessMore
Public Interactions1
Repost 1
Repost
1×
Peak Outlier—
Top Post Views131K
Peak Bookmark %0.3%
IMImNotHarsh | 📈💸
ImNotHarsh | 📈💸@imnotharshAI7.6K followers

𝗦𝗲𝗺𝗶𝗔𝗻𝗮𝗹𝘆𝘀𝗶𝘀 𝗷𝘂𝘀𝘁 𝗰𝘂𝘁 𝗶𝘁𝘀 𝗔𝗜 𝗰𝗮𝗽𝗲𝘅 𝗳𝗼𝗿𝗲𝗰𝗮𝘀𝘁, 𝗮𝗻𝗱 𝗡𝘃𝗶𝗱𝗶𝗮 𝘁𝗮𝗸𝗲𝘀 𝘁𝗵𝗲 𝗯𝗿𝘂𝗻𝘁 $NVDA

In its Nov 13th institutional model update, SemiAnalysis lowered its forecasts for AI accelerator shipments, spending, HBM and power demand, with 2028 to 2030 cut the hardest.

𝗧𝗵𝗲 𝗻𝘂𝗺𝗯𝗲𝗿𝘀 (𝗴𝗹𝗼𝗯𝗮𝗹 𝗔𝗜 𝗮𝗰𝗰𝗲𝗹𝗲𝗿𝗮𝘁𝗼𝗿 𝗰𝗮𝗽𝗲𝘅)

• 2026: ~$392B, roughly unchanged • 2027: $770B to $627B (-19%) • 2028: $1.054T to $758B (-28%) • 2029: $1.352T to $796B (-41%) • 2030: $1.531T to $923B (-40%)

Also cut: 2028 HBM demand by 30% and 2030 accelerator power demand by 34%.

𝗪𝗵𝘆 𝘁𝗵𝗲𝘆 𝗰𝘂𝘁

• Frontier lab net new ARR growth slowed in Q3, so they reset expected token revenue to what can sustainably pay for compute • Capital markets have tightened. Debt and equity investors are pulling back from AI capex that lacks hyperscaler commitments • The midterm results delayed 5.8 GW of US data center supply planned for 2H27 to 1H28, though they stress the first two reasons matter more

𝗪𝗵𝘆 𝗡𝘃𝗶𝗱𝗶𝗮 𝗯𝗲𝗮𝗿𝘀 𝘁𝗵𝗲 𝗯𝗿𝘂𝗻𝘁

The cuts don't land evenly. Customers keep buying the best performance per TCO and per watt, and the weakest platforms on those metrics take disproportionate cuts. By their framework, that is Nvidia: • Nvidia accounts for 66% of the cut in cumulative 2026 to 2030 accelerator wafer area • Its 2030 shipment forecast on a compute revenue basis is cut 66% • Lower ASP assumptions for Feynman and beyond as competition rises • At Anthropic, Nvidia GPUs sit at the margin next to TPU, Trainium and AMD. OpenAI is leaning on AMD and its own ASICs • Highest exposure to neoclouds, especially the smaller long tail with more financing risk

𝗠𝘆 𝘁𝗮𝗸𝗲

Read this carefully. It is not a call that AI demand is dying. Even on the new numbers, accelerator capex more than doubles from $392B in 2026 to $923B in 2030.

What it says is that the buildout is now limited by financing and revenue, not chips. That ties directly to what I have been saying about liquidity and the Anthropic raise pulling capital out of the market.

The winners from here are whoever has the best cost per token and the strongest balance sheet behind the order. Coming the same week Jensen left and the Treasury Secretary questioned Nvidia's revenue quality, this is one more weight on Tuesday's guide.

Translated excerpt attached. Credit @dmjk001 for original excerpt.

131K384(0.3%)3355326
View on X

Similar Creators

Explore AI →